Every few floors the site team posts what changed, with a drawing of where the frame stands. On a viewing you can walk the floors that are already up.
Now
Demo date
Stage 2 of 5: Structure
Floor ten is poured
Two floors and the roof slab to go. Floors nine and ten went up in the same three weeks as the floors below.
Placeholder
Our drawing, not a site photo. Your site photo goes here.
Newest first
Every update
Demo date
Stage 2 · Structure
Floor ten is poured
Two floors and the roof slab to go. Floors nine and ten went up in the same three weeks as the floors below.
Read the update
Demo date
Stage 2 · Structure
The frame reaches floor eight
Columns and slabs are up to floor eight. The crane comes down in early winter, once the roof slab is poured.
Read the update
Demo date
Stage 2 · Structure
Ground-floor slab poured
The podium slab is in, with the lobby, the residents’ lounge and the bike store set out on it in chalk.
Read the update
Demo date
Stage 1 · Groundworks
Groundworks complete
Piling and the basement walls are finished. The site hoarding now shows the floor plans at full height.