The frame reaches floor eight
Columns and slabs are up to floor eight. The crane comes down in early winter, once the roof slab is poured.
Where the build stood
Stage 2 of 5: Structure
The terracotta bar is the stage under way when this update was posted.
Placeholder
Our drawing, not a site photo. Your site photo goes here.
Columns and slabs are up to floor eight, two thirds of the way. The stair and lift cores are closed in up to floor four.
Your floor, in the open
If your home is on floors one to eight, its floor exists now. On a viewing you can stand where your living room will be and see the view it will have.
What comes next
Four floors and the roof slab remain. The crane comes down once the roof is poured, and the facade then climbs from the ground up.